Analytical Case Study

MACISTE: the airless pump that eliminated pulsations, breakages and contamination in glazing.

How the MACISTE airless pump (with a three-piston architecture and no hydraulic circuit) turned a critical glazing-line component into a stable, reliable, low-operating-cost element, becoming the new market standard.

  • 0.00% Glaze contamination
  • ~4,000 h MTBF (vs ~800 h of traditional pumps)
  • ~2 years Operation without maintenance
  • Customer RAK Ceramics
  • Location Ras Al Khaimah, United Arab Emirates
  • Solution MACISTE — Airless pump for glazing
01

Glazing: a critical process for finished-product quality

In the ceramic glazing process, the uniform application of abrasive products in suspension (glazes, engobes, crystallines) is a critical factor in ensuring finished-product quality.

Traditionally, lines used airless pumps based on hydraulic systems with pressurised oil. Although widespread, these technologies had structural limits in terms of spray stability, reliability and management costs.

Against this backdrop, in 2010 the MACISTE pump was launched: an automatic airless pump designed to improve efficiency, application quality and production continuity.

Uniform glaze application directly affects finished-product quality, line efficiency and overall operating costs.

02

The structural limits of traditional airless pumps

The analysis of traditional solutions reveals recurring criticalities that directly affect product quality, line efficiency and operating costs.

Pressure pulsations

Spray jet instability and non-uniform glazing quality on the tiles.

Membrane breakage

Frequent membrane breakages in hydraulic pumps, with recurring machine downtime.

Oil contamination

Risk of glaze contamination caused by hot-oil leaks from the pressurised circuit.

Costs and operator dependence

High maintenance costs, non-optimised consumption and strong operator dependence to manage anomalies.

03

An alternative architecture to the market standard

MACISTE introduces a radically different architecture: a three-piston system at 120° that mechanically moves the membranes, the total absence of a hydraulic circuit (no pressurised oil), a diaphragm pump coupled to an electric motor and control via a user-friendly PLC.

Functionally, this delivers stable, continuous pressure without pulsations, a constant spray jet over time, uniform glaze distribution, the elimination of contamination risk and a drastic reduction of stress on the membranes. The machine also integrates an anomaly-alarm system, automatic self-cleaning and a low-consumption motor (0.75 kW).

Parameter Previous solution New solution
Glaze contamination 3.50% 0.00%
Thickness uniformity (std dev.) ±5.0% < ±1.5%
Transfer efficiency 82% - 85% 96% - 98%
MTBF (mean time between failures) ~800 hours ~4,000 hours
Annual raw-material cost (glaze) +20% waste Baseline
04

Stability, reliability and operational simplicity

The MACISTE solution rests on three pillars. Process stability: thanks to the synchronised piston system, delivery is continuous and pulsation-free, improving spray quality. Structural reliability: eliminating the hydraulic system removes the main causes of failure (membrane breakage and oil leaks).

Operational simplicity: an intuitive interface, automatic alarms and integrated self-cleaning reduce operator dependence and minimise human error.

MACISTE — Inter Ser
  • Three pistons at 120°

    Synchronised mechanical movement of the membranes: stable, continuous pressure, zero pulsations.

  • Zero hydraulics

    No pressurised oil: membrane breakages and contaminating leaks eliminated at the root.

  • Constant spray jet

    A spray jet that stays uniform over time, for even glazing across the whole tile.

  • User-friendly PLC control

    Intuitive interface with automatic alarms for nozzle, pressure and piping.

  • Integrated self-cleaning

    Automatic self-cleaning system that simplifies end-of-shift operations.

  • Low-consumption motor

    0.75 kW electric motor: optimised energy consumption vs traditional systems.

05

Fast, low-impact integration on existing lines

Introducing MACISTE into the production line is fast and low-impact: installation on existing glazing lines, simple PLC setup, minimal operator training and immediate integration into production cycles.

Operationally, the operator can run the pump independently and step away from the machine thanks to the alarm system, while end-of-shift operations are simplified by automatic self-cleaning.

06

Tangible results in industrial applications

Before

Glaze contamination

Oleodynamic pump

After

Stable spray jet

Maciste airless pump

Industrial applications (including major international ceramic manufacturers) show tangible results: greater glazing uniformity and better finished-product quality, production continuity with no maintenance stops, elimination of routine membrane maintenance, no scrap risk from contamination and reduced energy consumption. Continuous operation reaches up to around 2 years without maintenance.

Metric Result Impact
Glaze contamination 0.00% No scrap from oil contamination
MTBF ~4,000 hours 5× the time between failures of traditional pumps
Transfer efficiency 96-98% More glaze on the tile, less waste
Membrane maintenance Eliminated Up to ~2 years of continuous operation
Energy consumption Reduced Motor of just 0.75 kW

What this case demonstrates

The MACISTE case shows how innovation on a seemingly secondary glazing-line component can deliver a simultaneous improvement in production quality, industrial efficiency and economic sustainability.

01

Stability beats power

Eliminating pressure pulsations, rather than increasing thrust, is what guarantees uniform, consistently high-quality glazing.

02

Simplifying architecture boosts reliability

Removing the hydraulic circuit eliminated the main causes of failure at the root: membrane breakage and oil contamination.

03

A secondary component can become strategic

The glazing pump, turned into a stable, low-operating-cost element, became the new market standard.

Next step

Got a similar situation?

If you run a ceramic line with similar technical challenges, we can help with targeted technical consulting.

07 Let's talk

Want to optimize your production line performance?

30 years in the ceramic industry. From diagnosis to solution, a single point of contact.